Request for Proposals
This project is the Planning/Design and Implementation of Northern Section of Bluff Point to Preston Tri-Town Trail.
The Town of Ledyard through the Ledyard Tri-Town Trail Committee is accepting proposals from professional planning, engineering and architectural firms or teams licensed in the State of Connecticut to assist with the planning, design development and plans and specification for the construction of the northern section of the proposed Bluff Point to Preston Tri-Town Trail. (Preston Community Park to Route 214 in Ledyard) The final trail configuration and length will be developed as part of the process.
Requirements
The firm(s) should be able to demonstrate a successful track record in the preparation of similar plans and projects in Connecticut communities and have knowledge and expertise in relevant regulatory and code requirements.
Submissions
Interested firms should submit statements of qualifications (5 copies) to:
Mayor’s Office
741 Colonel Ledyard Highway
Ledyard, CT 06339
Submissions should be made no later than 2 p.m.. on March 19, 2014.
Documents
Bid Documents Submitted
- Anchor Engineering Services Inc.
- Diversified Technology Consultants
- Kent and Frost Landscape Architecture
- Lenard Engineering Inc.
- Nafis and Young Consulting Engineers
The Ledyard Trail Committee has decided to negotiate a contract with Kent and Frost, Mystic, Connecticut.